Skip to main content
News

What actually happens between measuring and installation day

By 05/28/2026No Comments

A lot happens in those 10 to 14 days and most people have no idea.

After we measure your kitchen, the template goes to our fabrication shop. The slab you chose gets pulled, inspected, and laid out. Our team maps your countertop pieces onto the actual stone – deciding exactly where each cut lands to make sure the veining looks intentional, not accidental.

Then comes the cutting, edge profiling, and polishing. Sink cutouts, faucet holes, any custom details you asked for – all done before the stone ever leaves the shop.

By the time we show up at your door, your countertop is finished. Installation day is usually a few hours, not a full day.

That’s why the lead time exists.

See what we have in the shop